NigeriaPowerData

A live energy intelligence platform for the Nigerian electricity market, developed and owned by Jirow Technologies Limited. It consolidates Nigeria's publicly reported electricity data into a single continuously updated system of record.

Live · in operationnigeriapowerdata.com

Tracks national grid generation and frequency alongside distribution-company allocation, preserving the history required to distinguish a genuine trend from ordinary daily variation.

Installed capacity

13,625MW

measured

Available capacity

7,311MW

measured

Avg dispatched

4,222MW

measured

Stranded capacity

3,162MW

derived

The capacity cascade — MW

Measured capacityDelivered performance

  • Installed capacity13,625
  • Transmission wheeling8,700
  • Available capacity7,311
  • Peak ever delivered5,801.84
  • Average dispatched4,222

The gap between the first bar and the last is the sector's core problem.

Plant availability factor

32.72%

of installed fleet, Q1 2026

Load factor on declared capacity 92.26%

System frequency

49.75 – 50.25 Hz

prescribed band

Observed range 49.46 – 50.69 Hz · excursions outside band are flagged

Installed capacity: NERC Operational Factsheet, Feb 2026 · Available and dispatched: NISO, May 2026 · Peak delivered 5,801.84 MW, 4 March 2025 · Wheeling: TCN 2026 · Availability and load factor: NERC Q1 2026 · Frequency band: NERC. Fixed snapshot — figures update continuously on the platform.

The market it tracks

12

DisCos licensed

28

Grid-connected plants

9

Grid collapses in 2024

7.05%

Transmission loss factor

How to read the platform

The platform documents its own reading order. A single reading means little without the history beside it.

  1. 01Open the national dashboard
  2. 02Confirm the reading is fresh
  3. 03Compare the latest value against the 24-hour and 7-day trend
  4. 04Drill into the relevant entity or state page

The six modules

What the platform publishes.

Live generation dashboard

National output, frequency, system stability and restoration signals, each timestamped.

Market data panel

Settlement, cost-recovery and liquidity indicators read against operating data.

Distribution intelligence

DisCo allocation, transformer utilisation, capacity margin and risk classification.

State intelligence

Franchise data as geographic demand and infrastructure-stress estimates.

Methodology

How trend, ranking, risk and forecast indicators are calculated.

Data sources

The upstream publications each figure is drawn from.

Entity-level analysis

Down to the plant, the DisCo and the state.

How indicators are calculated

GenCo pages

Latest output against average — a large gap signals unusual movement. Then volatility, moving averages, forecasts and ranking.

DisCo pages

Allocation, transformer utilisation, projected 12-month utilisation. High settlement growth on a thin capacity margin indicates rising risk.

Concentration

Top GenCos and Top DisCos expose load concentration — a stress signal where loading outpaces upgrades.

Explore the platform

NigeriaPowerData is live and open.

Open the national dashboard to see generation, allocation and entity performance updating continuously — every figure attributed to its source and labelled measured or modeled.